Slideshow

FTSE 100 Security Case Study

Our work streamlined the circulation and the aesthetic of a congested and dated reception area, offering a vivid but appropriate contrast to the building’s conventional façade while delivering the efficient functionality such a busy area demands.

Time scale: 8 weeks on site

Location: Surrey

Contract value: £0.25m

Staff numbers & space: 2000 sq ft

Features:

  • The envelope of the reception area extended to include an existing covered terrace area
  • Creation of a new entrance façade which required Planning Consent
  • Future upgrade prepared for Disabled Access facility

 

Download IOR Office Design philosophy

Download IOR office design process

Download IOR office design point of view